Customer Success Stories
Filter by industry, market or product type to find a comparable implementation.
Large European Municipal Water Group
The customer inspected the factory in October 2024 and approved the production and quality control system. The 10,000-unit order was signed in November 2024 and delivered within 3 months. Tianfei Haitai provided on-site installation guidance, commissioning training and remote technical support. Achievements Precise control: 4–20mA regulation, response time ≤ 0.5s, flow control error < ±2% Stable and reliable: zero leakage and zero major failures in 16 months of operation Efficient O&M: remote monitoring, fault diagnosis and automatic alarm, reducing maintenance cost by 40% Energy saving: low power consumption design, saving more than 120,000 kWh of electricity annually Fully compliant with EU standards and French water industry requirements
Have a Similar Project?
Share your site conditions, required dimensions and application. Our engineering team will recommend a comparable solution.